Santa Fe Trestle Trail
This project includes the rehabilitation of the Santa Fe Trust Bridge and the construction of a new bridge across the Dallas Floodway with a connection to the DART station at Corinth Street and Moore Park.
Alpha provided geotechnical engineering services to the City of Dallas, including subsurface investigation, laboratory analysis, and design recommendations.
Alpha is currently providing construction materials testing services for this project, including mass grading, piers, utilities, concrete and structural steel inspection and testing.
